Tawa Gas Gate - Wellington

Project

Project Details

Project type

Protective Coatings

Client

Powerco

Services utilised

SA 2.5 Altex coating system

Protective coatings Wellington were engaged by Powerco to complete this project. The on-site team had to identify and prepare all areas showing of early signs of coating break down, the steel was prepared back to a SA2.5 prior to applying the Altex approved coating system to make sure this vital infrastructure is back in top shape and ready to handle the sometimes harsh Wellington weather conditiions.

Previous
Previous

WIAL - South Facade, Wellington

Next
Next

DRS Gas Site - Mount-Maunganui Bay of Plenty