Projects

Tawa Gas Gate - Wellington

Welliington

Project Details
Project Type
Protective Coatings
Client
Powerco
Services Utilised
SA 2.5 Altex coating system
Timeline
Project Description

Protective coatings Wellington were engaged by Powerco to complete this project. The on-site team had to identify and prepare all areas showing of early signs of coating break down, the steel was prepared back to a SA2.5 prior to applying the Altex approved coating system to make sure this vital infrastructure is back in top shape and ready to handle the sometimes harsh Wellington weather conditiions.